The new cooler panels have arrived. We are open, stop by and say hi.

Week of Feb. 9: Demo week is finally over! Thank you everyone for your patience and putting up with the noise.  We are ready to pour the concrete!  It will take about a week for the concrete to settle.  Check back next monday for another update and of course come on in and say hi!

Week of Feb. 3: Demo Week Take Two!  After a minor set back, we are back on schedule for the removal of the concrete floor.  The process of cutting the concrete is a little noisy but you should see very little disruption to the front of the store.  We are open, so come on in and say hi!

Week for Jan 27: Demo begins!  This week the concrete floors in the fridge and freezer will be cut into pieces and removed.  This cutting process may be very noisy and cause vibration, but will only last 1-2 days.  You should see very little disruption to the front of the store during this entire process.  We are open, so come on in and say hi!

The work on the walk in freezer and refrigerator will start on Monday, January 20. The duration of the repair is estimated to last about 6 weeks. The store will be open the entire time of the repair and the construction should not affect the ability of customers to shop in the store. There will be a dual temp trailer parked in front of the store during the entire time of the repairs. This is where we will store the back stock of products that were held in the walk-ins.  The week of 1/27 is demo week.  This week the concrete floors in the fridge and freezer will be cut into pieces and removed.  This cutting process may be very noisy and cause vibration, but will only last 1-2 days.  You should see very little disruption to the front of the store during this entire process.  We are trying to stay open as much as possible during the construction time.  However, we do take the safety of the staff and customers very seriously.  If there is a decision to be made about closing or opening late we will do our best to communicate with our staff and customers effectively and in a timely manner

Thanks to all of you who contributed the funds to help us repair this essential equipment and please continue to shop the Co-op.